A spreader beam to be used with steel pins and lifting cables to avoid cracking at junction of side wall and base slab.
Stacking :
U-drains are to be stacked on level and stable ground to avoid cracking of base slab.
Laying :
For most installations, U-drains may be laid on sand bedding. However, in bad ground, it may be necessary to excavate deeper and place a layer of hard core before placing the sand bedding.
Jointing :
Butt joints. Where necessary, cement mortar is normally used to fill the gap between U-drain units.
Backfilling :
Backfilling with selected free draining backfill material. Avoid use of heavy vibratory equipment next to side walls.
* Ready stock / Made to order available. Kindly specify type and dimension required. Otherwise, please approach our sales team for assistance.更多 PINTAS TRADING SDN BHD 相关资料
PINTAS TRADING SDN BHDBuilding Materials Supplier Penang, Ready Mixed Concrete Supplies Malaysia, Power Trowel Service ~ PINTAS TRADING SDN BHD