Screw Compressor Start Up & Shut Down Procedure

Screw Compressor Start Up & Shut Down Procedure

What are the procedure to start up and shut down screw compressor?

Starting up and shutting down a screw compressor properly is crucial for its performance and longevity. Here are the general procedures for both:
 
Screw Compressor Start-Up Procedure:
1. Inspect the Area:
   - Ensure the screw compressor and surrounding area are clear of obstructions and safe to operate.
 
2. Check Oil Level:
   - Verify the oil level in the air compressor. Top up if necessary following manufacturer guidelines.
 
3. Open Air Outlet Valve:
   - Ensure the air outlet valve is open to allow air flow once the screw compressor starts.
 
4. Close Bypass Valve (if applicable):
   - If there's a bypass valve to bypass the air compressor, ensure it's closed for normal operation.
 
5. Turn on Power:
   - Start by turning on the power to the air compressor and any associated equipment (such as air dryer or filters).
 
6. Initiate Start-Up Sequence:
   - Follow the specific start-up sequence outlined in the air compressor's manual. This may involve pressing start buttons or switches in a particular order.
 
7. Monitor Start-Up:
   - Observe the air compressor during start-up for any unusual noises or vibrations. Check that pressure builds up steadily.
 
8. Check Control Parameters:
   - Once the air compressor is running, monitor control parameters such as discharge pressure, oil pressure, and temperature to ensure they stabilize within normal operating ranges.
 
9. Adjust Settings (if needed):
   - Set the operating parameters (pressure, temperature) on the air compressor according to your requirements and ensure they are within safe limits.
 

Screw Compressor Shut-Down Procedure:
 
1. Prepare for Shut-Down:
   - Before shutting down, reduce the load on the air compressor by gradually decreasing the air demand if possible.
 
2. Check Operating Parameters:
   - Monitor the operating parameters of the air compressor to ensure they are within safe ranges.
 
3. Close Air Outlet Valve:
   - Close the air outlet valve to stop airflow from the air compressor.
 
4. Follow Shut-Down Sequence:
   - Follow the shut-down sequence as specified in the air compressor’s manual. This may involve pressing stop buttons or switches in a particular order.
 
5. Cool Down Period:
   - Allow the air compressor to run unloaded (if equipped) for a brief period to cool down components.
 
6. Monitor Parameters:
   - Continue to monitor control parameters such as discharge pressure, oil pressure, and temperature as the air compressor shuts down.
 
7. Shutdown Power:
   - Once the air compressor has completed its shut-down sequence and cooled down, turn off the power to the air compressor and any associated equipment.
 
8. Post-Operation Checks:
   - After shut-down, inspect the air compressor for any signs of abnormalities such as leaks, unusual noises, or excessive vibrations.
 
9. Record Operation Data:
   - Maintain a record for the air compressor of operating parameters and any observations for future reference.
 
By following these procedures, you can ensure that your screw compressor starts up and shuts down safely and efficiently, maximizing the air compressor lifespan and performance. Always refer to the specific manufacturer's guidelines and recommendations provided in the air compressor's manual for detailed instructions tailored to your equipment.
 
Feel free to contact us for more information of screw air compressor!
Call us or whatsapp us at +6016-753 6908 / +6016-755 3178
Megah Machinery Logo
Megah Machinery Indonesia
Contact us Indonesia flagIndonesia