Ballast Water Treatment System BWTS

Ballast Water Treatment System BWTS

Kategori: BWMS Introduction Tersedia
Untuk maklumat lanjut, lawati laman web rasmi kami di yfmarine.com

Penerangan

BALLAST WATER MANAGEMENT SYSTEM (BWMS / BWTS)

The Ballast Water Management Convention entered into force on 8th September 2017.

All new ships built after 8th Sept 2017 must meet D2 Standard.

D2 standard specifying the maximum amount of viable organisms allowed to be discharge, including specified indicator microbes harmful to human health. Basically it involves installing ballast water management system.

All Ballast Water Management System (BWMS) must be IMO type approval type.

All existing ships built before 8th Sept 2017, with renewal survey after 8th Sep 2019, must meet the D2 standard during renewal survey.

All ships must meet D2 standard by 8th Sep 2024.



Our Solutions

Yee Fong Marine provides shipowner reliable one stop solutions for BWMS retroffit project start from the initial ship survey, front end conceptual engineering, 3D scanning, detail design engineering for Class approval, produce fabrication drawing, material & piping prefabrication to onsite supervision and installation services.
















To read full infografic as shown, please download the file attached above.

















Lebih maklumat tentang Yee Fong Marine Sdn Bhd
Yee Fong Marine Sdn Bhd
Yee Fong Marine Sdn Bhd Marine Valves Kuala Lumpur (KL), Piping Fabrications Johor Bahru (JB), Selangor, Marine Equipment Supplier Malaysia, Singapore ~ Yee Fong Marine Sdn Bhd