Year: 2014
Contract Type: Engineering Design, Construction, Fabrication & Installation
We successfully executed the expansion of a Marine Paints/Coating Plant, increasing its capacity by converting existing offices into a production area and installing additional mixing equipment. This project highlights our expertise in complex plant modifications and installations.
Our scope of work included:
The challenges of this project involved working in a flammable environment, necessitating strict adherence to safety protocols and innovative engineering solutions to mitigate risks. Additionally, most of the work had to be carried out during night-time when production was halted, ensuring minimal disruption to ongoing operations. All electrical items were required to comply with explosion-proof zone 1 requirements, ensuring the highest level of safety and reliability.
This project underscores our capability to handle complex plant expansions in the chemical industry, delivering high-quality, efficient solutions while maintaining stringent safety standards.
Lebih maklumat tentang L-Vision Engineering Pte Ltd