Includes bottle of electrolyte, 1 sanding disc and 6 screw-on cap membranes. 1.25 Mil PE membranes (Yellow cap). Convenient screw-on cap membranes make membrane changes simple and easy.
• Response Time (T95 - from 0 to 100%) = 8 seconds
• Flow Dependence After 4 Minutes = 25%
• Required Flow Rate = 6 inches/second
Equipment used with | This is standard, Polarographic Probe |
---|