Energy produce from the installed solar PV system will be consumed first, and any excess will be export to TNB on “one-on-one” offset basis.
Applicable to Domestic, Commercial, Industrial and agriculture sector
NEM Calculation FOR NEM RAKYAT & NEM GOMEN
Net Charge Amount (RM) = (Energy Imported from Distribution Licensee* x Gazetted Tariff) – (Energy Exported to Distribution Licensee x Gazetted Tariff)
1 kWh exported to the grid will be offset against 1kWh consumed from the grid with the gazetted tariff. The export charges are charged in descending order (start from the highest tariff rate charged on the applicable month)
NEM available Quota
500MW quota allocate for year 2017 to 2020 for Peninsular Malaysia!