Engineering and Technical Details of Sectional Tank Installation
Conclusion
Foundation Design and Preparation:
Soil Analysis: Before construction begins, soil analysis is conducted to assess bearing capacity and soil stability. This informs the design of the tank's foundation, ensuring it can support the weight of the tank and its contents.
Foundation Types: Depending on soil conditions and tank size, foundations may include concrete pads, ring beams, or compacted gravel bases. These foundations provide stable support and prevent settlement over time.
Panel Handling and Installation:
Panel Specifications: GFS panels are typically made from low-carbon steel coated with a glass frit. Panels vary in thickness (typically 2mm to 6mm) depending on tank size and design requirements.
Handling Equipment: Panels are lifted into position using cranes or lifting equipment capable of handling heavy loads. Careful handling is crucial to prevent damage to the glass coating during transportation and installation.
Bolted Connection and Sealing:
Bolt Specifications: Stainless steel bolts and nuts are used for assembly due to their corrosion resistance and strength. Bolt sizes and grades are selected based on engineering calculations to withstand operational loads and environmental conditions.
Sealing Materials: High-quality gaskets or sealing materials, such as EPDM (ethylene propylene diene monomer) rubber, are placed between panel joints to ensure a watertight seal. The selection of sealing materials considers chemical compatibility and temperature resistance.
Torque Control: Bolts are tightened to specific torque values recommended by the tank manufacturer. Torque control ensures uniform compression of gaskets, preventing under-tightening (which could lead to leaks) or over-tightening (which could damage the glass coating).
Roof and Accessories Integration:
Roof Structure: For tanks with roof structures, roof panels or beams are installed and securely bolted to the top ring of the tank. Roof panels are sealed to prevent water ingress, and roof vents or hatches may be installed for ventilation and maintenance access.
Accessories: Inlet/outlet pipes, manways, level indicators, and other accessories are integrated into the tank design as specified by project requirements. Each accessory is securely mounted and sealed to maintain structural integrity and operational functionality.
Quality Assurance and Testing:
Visual Inspection: Throughout the erection process, visual inspections are conducted to verify panel alignment, joint integrity, and the absence of defects in the glass coating or structural components.
Leak Testing: Hydrostatic pressure testing is performed after assembly to ensure the tank is leak-free. The tank is filled with water or another test liquid and pressurized to a specified level while monitoring for any signs of leakage from joints or seams.
Documentation and Compliance:
Documentation: Comprehensive records are maintained throughout the erection process, including assembly procedures, inspection reports, bolt torque values, and test results. This documentation ensures compliance with industry standards and client specifications.
Safety and Training: Installation teams are trained in safety protocols and tank assembly procedures to prevent accidents and ensure efficient project execution. Client personnel may receive training on tank operation, maintenance, and safety practices.
The erection process of glass fused to steel bolted tanks integrates advanced engineering principles with meticulous construction practices to deliver durable, corrosion-resistant storage solutions. By emphasizing soil analysis, precise panel handling, proper bolted connections, and rigorous testing protocols, manufacturers and installers ensure GFS tanks meet performance expectations and provide reliable service in various industrial and municipal applications.
Safety precautions are tightly practiced by Global Tankcom project team, as safety is always the priority at the job site. Our team conprises of Oil & Gas safety Passport (OGSP), Confined Space training, CIDB Green Card etc in preparation for any jobs that require those certifications/trainings.