Description
- For verification of electrical resistance
- Includes decade box, cable and calibration verification procedure
Note: To verify voltage, a calibrated multimeter (not included) is required.
For use with the PosiTest LPD
More detail about ALLIANCE SUPPLIES SDN BHD