Year: 2005-2006
Contract Type: Mechanical Installation
This project was to upgrade the existing alkalizing & roasting facility by adding 1 unit of Conditioner and 1 unit of Roaster at the existing plant.
As main contractor for this project, we installed the Conditioner & Roaster supplied by the specialist contractor from UK. Major lifts involving 400 ton & 500 ton cranes tandem lifting of Roaster & Conditioner (3m diameter x 23m length) through existing plant roof 33m. More detail about L-Vision Engineering Pte Ltd