It can be expanded without waste by building block system.
By lineup of insulation Monitoring Model (Model: EMU4-LG1-MB), it contributes to early detection of abnormalities (Leakage current etc.) of production equipment and prevention of failure.
CC-Link Communication Unit can be connected to the system using CC-Link communication.
The current measurement time can be calculated and the data can be utilized in diagnosing production equipment service life and for performing preventive maintenance.
Devices correspond to international standards like CE marking, UL, etc. and also meet demands for standards or embedded applications in overseas equipment.