Replacement of faulty motorised valve and flanges

Replacement of faulty motorised valve and flanges

分类: Cooling Tower and AHU 当前有货
欲了解更多详情,请游览我们的官方网站 mysanjung.com

详情

Successfully performed 8'' motorized valve replacement along with PN 16 flange consist with motorized actuator termination for one of our clients at KL site. Our team prefabricated the flange and short piece at our workshop then proceeded to cut off the faulty flange and valve on site. The reason for this replacement is due to parts faulty and unable to function causing high water flow to the cooling tower. This replacement will help the customer to prevent the problem and keep their equipment in good condition in the future.

更多 Sanjung Khas Sdn Bhd 相关资料
Sanjung Khas Sdn Bhd
Sanjung Khas Sdn Bhd Air-Conditioning System Repair Selangor, Commercial Air-Cond Installation KL, Cooling Tower Maintenance Malaysia ~ Sanjung Khas Sdn Bhd