详情
Application Procedures
Fill-Coat #1 is delivered to the casing site in Trenton insulated tank trucks and pumped through an opening at the top of the casing vent until the annulus between the casing and the carrier pipe is filled.
Packaging
Material is pumped directly into the casing from Trenton’s heated tankers.
Specifications
Color |
Dark Brown |
Specific Gravity at 60°F |
.80 – .90 |
Pour Point |
100 – 120°F |
Flash Point |
300°F minimum |
Advantages
- Prevents galvanic and atmospheric corrosion within casings
- Has good “wetting” and adhesion characteristics
- Displaces and prevents re-entry of water in casings
- Corrects “water shorts”
- Protects casing from deterioration
- Reduces cathodic protection current drain Possibly corrects “metallic short”
- Satisfies DOT requirements for shorted casings
- Carrier pipe can be removed
- Inert and nonvolatile
- Relatively inexpensive
- Delivered and installed by heated tank trucks
- Extra material brought to jobsite
- Surplus material returned to our facilities at no extra charge
- Material installed through meters
- Experienced personnel to perform work
- Equipment available for small and large jobs
- Storage facilities to insure material availability
更多 Kinetic Hardware Supply Sdn Bhd 相关资料