Year: 2009
Contract Type: Engineering Design & Equipment Fabrication
We proudly contributed our expertise to the establishment of a Precipitated Calcium Carbonate (PCC) Plant on an empty plot within an existing paper mill located in Yueyang, China.
Our services encompassed detailed engineering and tender documentation, which included:
Additionally, we fabricated and supplied critical equipment for the plant, such as the PCC Slaker and Lime Handling System, which included screw conveyors and bucket elevators. Our scope extended to the design, supply, fabrication, and commissioning of the entire Lime Handling System, ensuring a seamless and efficient setup for our client.
This project demonstrates our capability to deliver detailed engineering design services and equipment fabrication, meeting the highest standards of quality and efficiency in the mineral industries.
Tingnan ang karagdagang mga detalye tungkol sa L-Vision Engineering Pte Ltd