At EKG M&E Sdn Bhd, we provide professional air-cooled chiller removal and new installation services, helping businesses transition from aging, inefficient systems to high-performance, energy-efficient cooling solutions. Our team handles the entire process—from dismantling and safely disposing of old units to designing and installing state-of-the-art systems tailored to your building’s needs.
Site inspection and preparation to ensure safe removal with minimal disruption
System disconnection, including electrical isolation and chilled water line removal
Refrigerant recovery in compliance with environmental and safety regulations
Dismantling and proper disposal or recycling of the existing unit and components
Cooling load assessment and system design based on current and future demands
Supply of high-efficiency air-cooled chillers with low-GWP refrigerants, inverter-driven compressors, and smart controls
Full mechanical and electrical installation, including piping, valves, pumps, insulation, and power integration
Integration with Building Management Systems (BMS) or installation of smart standalone controllers
Pressure testing, refrigerant charging, and operational verification
Performance calibration to ensure optimal cooling output and efficiency
Handover with documentation, operation manuals, and user training
Improved Cooling Performance – Consistent and reliable temperature control across your facility
Energy Efficiency – Modern systems use less power and adapt to variable cooling demands
Lower Operating Costs – Reduced maintenance needs and lower energy bills
Environmental Compliance – Use of eco-friendly refrigerants and components that meet today’s green standards
Increased System Reliability – Fewer breakdowns and downtime with new equipment
End-to-End Project Management – From site survey to final commissioning, we handle it all
Expert Team – Skilled in both removal of legacy systems and modern HVAC installations
Customized Solutions – Every system is tailored to your building’s cooling requirements and space constraints
Fast Turnaround – Timely project completion with minimal disruption to daily operations
Ongoing Support – We offer post-installation maintenance, repair, and performance monitoring
Replacing an outdated chiller is a smart investment in your building’s long-term performance and energy savings. With EKG M&E Sdn Bhd, you get a seamless experience—from safe removal to expert installation of your new air-cooled chiller. Contact us today to schedule a site assessment and take the first step toward a more efficient cooling system.
Lebih maklumat tentang EKG M & E SDN. BHD.