Opening Directions
LEFT Opening | RIGHT Opening |
|
|
Door knob on LEFT | Door Knob on RIGHT |
Hinges on RIGHT | Hinges on LEFT |
Features
Building Material & Bulk Order (Please whatsapp us for building material or bulk order ,we will provide special offer for you)
Technical Detail THI Door Frame
Installation Procedure
Mark out the area where the brickwork and the door is going to be | |
Use two lengths of timber to prop up door to standing position. | |
Use a spirit to plumb the frame. When it's plumbed, secure the timber stays with a couple of bricks. | |
You can now proceed to lay the bricks into the rebate at the back of the frame. | |
It is important to place mortar into the gap between the brick and the frame. This is to ensure that the frame when filled with cement will be extremely rigid and strong. Further, the wall will be constructed plumb with uniform thickness. | |
Each metal door frame is supplied with a number of wire brick ties. Use them to tie brickwork every fouth of fifth brick course. |
Disclaimer
All product images shown are for illustration purposes only. Actual products may varies in term of size, type, brand, version, colour, and other relevant characteristics.
More detail about Soon Shing Building Materials Sdn Bhd