Description
Year: 2022
Contract Type: Equipment Removal & Equipment Installation
In an effort to maintain optimal storage conditions for cocoa nibs, we undertook a 1-to-1 silo replacement project for our client. The existing silo, which had become unsuitable due to wear and tear, was replaced with a brand-new, high-quality silo designed specifically for cocoa nib storage.
Our scope of work included:
- Design & Supply of a new nib silo to ensure the best storage conditions for cocoa nibs.
- Temporary Removal of the plant building roof to facilitate the silo replacement process.
- Removal & Disposal of the old, worn-out silo to make way for the new installation.
- Installation of the new cocoa nib silo, ensuring it meets all operational and safety standards.
- Reinstatement of the roof to restore the plant building to its original state.
- Reinstatement of the screw conveyor and inlet hopper system to ensure seamless integration with the new silo.
More detail about L-Vision Engineering Pte Ltd