Process Timeline

At Carte Kitchen, we ensure that every step of your kitchen renovation or installation is handled with precision and care. Our renovation process timeline is designed to provide a clear and organized approach to transforming your kitchen. From the initial consultation to the final touches, our timeline ensures every stage of your renovation is efficiently managed, keeping you informed and involved throughout. Here’s a clear breakdown of our process to guide you through each stage of your journey:
Stage 1: Consultation

We begin with a personalized consultation to understand your space and requirements. During this session, we’ll develop a detailed space plan and provide you with an immediate quotation.
Once you're happy with the design and proposal, you can confirm the project by signing up with a deposit.

 
Stage 2: Site Measurement

Our team will visit your home to take accurate measurements of your kitchen space.
Within 1-2 weeks, we’ll provide you with a 3D design based on your layout.
This is the stage where you can finalize the design, including details such as the electrical and plumbing plans.

 
Stage 3: Site Preparation

At this stage, your contractor will complete the necessary electrical and plumbing work (M&E) based on the finalized design.
Once the site is prepared, we’ll return to take a final set of measurements to ensure the perfect fit for your kitchen.

 
Stage 4: Cabinet Production

Once the final measurements are confirmed, we begin production of your custom cabinets.
A 50% production payment is required at this stage to proceed.
The production process typically takes 4-6 weeks, while more intricate carpentry can take 2-3 months.
Upon completion, we’ll schedule delivery and installation after the remaining balance is settled.

 
Stage 5: Installation

The installation of your cabinets will take approximately 3-5 days, ensuring every piece is perfectly fitted.
Once the cabinets are in place, we’ll measure for the countertop, which will be installed within 2 weeks.
The countertop installation itself usually takes 1-2 days, completing the transformation of your kitchen.

A step-by-step guide of the renovation process gives you an idea of concept in timeline for the common where-to-begin dilemma. If it is still confusing, your designated Design Consultant will guide you every step of the way. So talk to us, let us take care of you.

 

Ready to Bring Your Dream Kitchen to Life?

Our team at Carte Kitchen is committed to making your kitchen renovation as smooth and seamless as possible. From the first consultation to the final installation, we’ll be with you every step of the way.
Let us take care of the details, so you can enjoy a beautifully crafted kitchen that fits your lifestyle.

 

Contact us today to get started!