We are thrilled to announce the successful completion of the highly anticipated a private school refurbishment project at Adni Islamic School, Taman Sri Ukay, Ampang! Being a dedicated contractors, we are excited to share the transformation that has taken place, reinforcing a 30 years old building with new PPR-Pipes, torch-on membrane waterproofing, rectifying rainwater ponding issues with new built drain and new floor gradient. We take immense pride in delivering this crucial project with utmost precision and quality craftsmanship.
Project Timeline
- Contract Date: 12th June 2023
- Handover Date: 26th July 2023
- Work Duration: 6 Weeks
- Scope Of Work: Rectification Of Slanted Wall, New Piping System, Waterproofing Work
Project Scope
New Piping System: SBB BINAJAYA SDN BHD has worked tirelessly to design, install, and test a modern and efficient piping system with best of it's class PPR-pipes & 2 Nos. Grundfos CMBE 10-54 water pumps. The recommended use of PPR-pipe is to resolve the challenge of inapproriate plumbing maintenance in the upcoming years of use. This upgrade ensures a reliable and uninterrupted flow of water throughout the premises
Waterproofing Solutions: Immediate after removing the cracked concrete floor at rooftop. We have constructed new drains directing rainwater to new designated rainwater downpipe to ensure a direct discharge from rooftop to public drain, without travelling through the school compound. A layer of Baumerk torch-on membrane was applied on the surface of new concrete floor to reinforce rooftop waterproofing, safeguarding the building from moisture and potential water damage, ensuring the longevity and intergrity of the school building structure.
We would like to extend our heartfelt appreciation to the property owners, facility managers, and all involved stakeholders for trusting us with this essential project.
SBB BINAJAYA SDN BHD